Meeting Summary Notes
Presentations
Overview
- Mike Plum (.pdf) Design review process and charge to committee.
Usage Scenarios, Beam Modes and Parameters, BPM System Requirements, Interfaces,
and Cost and Schedule
BPM Electronics - John Power (.pdf)
BPM Pickup Responses and Electronics Processing.
BPM Data Acquisition - Matt Stettler
(.pdf) BPM Data Acquisition Electronics.
BPM Pickups - D. Oshatz, P. Cameron,
J. OHara (.pdf) Pickups design, including MEBT, DTL, CCL, SCL,
and HEBT pickups.
SNS
Diagnostics Advisory Committee Report Committee
members: R. Webber (FNAL/chairman), J. Crisp (FNAL), R. Johnson (SLAC).
LANL
Design Team Reponses BPM Pickups, BPM Electrical Performance and Electronics,
and BPM Data Acquisition
8:00 to 2:00 MST. Video
conference. Aviary meeting room at LANL.
Agenda:
8:00 Coffee, goodies, and video setup.
8:30 Presentation of system requirements and usage scenarios for both
position and phase measurements. Cost and schedule breakdown. (pdf)
M. Plum. (~30 min.)
9:15 Pickups design, including MEBT, DTL, CCL, SCL, and HEBT pickups.(pdf)
J.O'Hara / P. Cameron / D. Oshatz. (~30 min.)
10:00 Break (~15 min.)
10:15 Processor and PCI mother board design.
J. Power (pdf)
and M. Stettler. (pdf) (~1
hour)
11:15 Discussion (~45 min.)
12:00 Working Lunch/committee meeting (~1.5 hrs)
1:30 Closeout Session
2:00 Adjourn
Design review board:
R. Webber
J. Crisp
R. Johnson
|