| |
Diagnostic Documents
Disclaimer:
SNS diagnostic presentations are presented as “is”. Our intention is to
provide an unedited set of documents. For detailed information please
refer to the reviewed technical documents.
Systems Requirements Document for Equipment, Device and Signal Naming
. This requirements document defines the equipment, device, and signal naming and numbering
to be used for all SNS systems. These requirements apply to all devices (beam instrumentation, sensors, actuators, etc.), equipment
(power supplies, magnets, RF cavities, targets, moderators, instruments, etc.) and signals in technical
systems and conventional facilities. These requirements do not apply to cable numbering, pipe numbering,
or location designations throughout the facility.
The designations listed are to be used on operator screens, drawings, schematics, computer software,
project databases, equipment name tags, test procedures, and other sources of information.
LabVIEW
Shared Memory Interface to EPICS IOC. Data acquired and processed
by LabVIEW is available to the IOC to communicate to an EPICS based control
system. LabVIEW and the IOC can also send interrupts/signals to notify
each other that data is available.
Cameron 2003 PAC Conference Paper SNS
Ring Diagnostics. An overall description of the SNS project and status
is available in these proceedings, as well as an update on the Ring and
Transfer Lines.
Preliminary
Design Review Agenda/Documentation Meeting Agenda for SNS Beam Position
Monitor System -- Preliminary Design Review, Febuary 27, 2001, Las Alamos,
NM.
DAC
Review 2000 Agenda/Documents Materials for the Diagnostic Advisory
Committee Review, December 14 and 15, 2000, Oak Ridge, TN.
|
|