Numbers of installed units:
DTL: 5
CCL: 1
Responsible parties:
Analog electronics: John Power, LANL.
Digital electronics: Matt Stettler, LANL.
Pickups: Ross Meyer, LANL
Measurement:
The energy degraders and Faraday Cups provide a method to
determine the nominal rf phase and amplitude set points for the DTL linac. The
Faraday Cups can also be used as beam stops and for current measurements.
Key specifications:
Peak beam current range: 10 to 60 mA.
Beam pulse length: Up to 50 us.
Inputs:
1 cable from Faraday Cup
1 cable from energy degrader.
Degrader and Faraday Cup position readbacks.
RTDL/event link.
120 Vac (on/off control via control system).
Channel Access
Outputs:
Degrader and Faraday Cup position control.
Channel Access.
Delivery schedule:
Spring 2002 deliver pickups.
Summer 2002 deliver electronics.