ORNL Neutron Sciences SNS & HFIR Logos
Transportation Electronics Manufacturing Environment Medicine Engineering Plastics
 
     
 

HFIR

HFIR Operating Status

This is the High Flux Isotope Reactor Operations Status and Forecast Report as of 12:00 Tuesday, May 6, 2008.

The reactor is shutdown for fuel cycle outage 414. The reactor was shutdown at 14:14 on Saturday, April 19.

Startup for cycle 415 is expected to take place on June 4.

HFIR Long Term Operating Forecast (pdf)
HFIR Short Term Operating Forecast (pdf)
FY 2008 HFIR Planning Schedule (pdf)

HFIR Related Links

 

 

 
  Information Contact: neutronscience@ornl.gov  

Oak Ridge National Laboratory

Office of Science