HFIR Operating Status
This is the High Flux Isotope Reactor Operations Status and Forecast Report as of 12:00 Tuesday, May 6, 2008.
The reactor is shutdown for fuel cycle outage 414. The reactor was shutdown at 14:14 on Saturday, April 19.
Startup for cycle 415 is expected to take place on June 4.
HFIR Long Term Operating Forecast (pdf)
HFIR Short Term Operating Forecast (pdf)
FY 2008 HFIR Planning Schedule (pdf)
HFIR Related Links
|