General Operations Plans for Fiscal Year 2008
(Oct. 2007-Sept. 2008)

HFIR

HFIR Run Schedule (pdf) [Oct. 07—Sep. 08]

  • Operate six full-power operating cycles during FY2008.  Each cycle is 23-25 days.
  • Install and commission the US/Japan Cold Triple-Axis Spectrometer on guide CG-4.

HFIR Users List Schedule (pdf):
List of users scheduled to be working at ORNL in the near term

SNS

SNS Run Schedule (Oct. 07—Sept. 08)

Install and commission 4 new instruments:

  1. Cold Neutron Chopper Spectrometer (CNCS) - Beamline 5
  2. Powder Diffractometer (POWGEN3) - Beamline 11A
  3. Extended Q-Range Small-Angle Neutron Scattering Diffractometer (EQ-SANS) - Beamline 6
  4. Spallation Neutrons and Pressure Diffractometer (SNAP) - Beamline 3

SNS Users List Schedule (pdf):
List of users scheduled to be working at ORNL in the near term

 

 