General Operations Plans for Fiscal Year 2008
(Oct. 2007-Sept. 2008)
HFIR
HFIR
Run Schedule (pdf) [Oct. 07—Sep.
08]
- Operate six full-power operating
cycles during FY2008. Each
cycle is 23-25 days.
- Install and commission the US/Japan
Cold Triple-Axis Spectrometer on
guide CG-4.
HFIR Users List Schedule (pdf):
List of users scheduled to be working at ORNL in the near term
SNS
SNS
Run Schedule (Oct. 07—Sept.
08)
Install and commission 4 new instruments:
- Cold
Neutron Chopper Spectrometer (CNCS) - Beamline 5
- Powder Diffractometer (POWGEN3) - Beamline
11A
- Extended
Q-Range Small-Angle Neutron Scattering
Diffractometer (EQ-SANS) - Beamline 6
- Spallation
Neutrons and Pressure Diffractometer
(SNAP) - Beamline 3
SNS Users List Schedule (pdf):
List of users scheduled to be working at ORNL in the near term
|