ORNL Neutron Sciences SNS & HFIR Logos
Transportation Electronics Manufacturing Environment Medicine Engineering Plastics
     
 

Presentation Index LLRF 2007

Knoxville, Tennessee
October 22-25, 2007

All presentations are provided below in PDF format.

 

001: ZTEC Presentation

002: Lab Talk—BNL (Smith)

003: Lab Talk—CERN (Hofle)

004: ICALEPCS Workshop Summary (Kasemir)

005: SRF 2007 Workshop Summary (Champion)

006: Lab Talk—DESY (Simrock)

007: Lab Talk—FNAL (Chase)

008: Lab Talk—JLAB (Hovater)

009: Lab Talk—KEK (Michizono)

010: Lab Talk—LANL (Prokop)

011: Lab Talk—ORNL (Ma)

012: A Fully Integrated Controller for RF Conditioning of the LHC Superconducting Cavities (Molendijk)

013: Lab Talk—SLAC (Akre)

014: Lab Talk—TRIUMF (Fong)

015: Performance of J-PARC Linac RF System (Kobayashi)

016: Digital LLRF for ALBA Storage Ring (Salom)

017: Timing and LLRF for the Argonne Short X-Ray Pulse Beamline (Lenkszus)

018 Agilent Technologies presentation

019: Development of a Digital Self-Excited Loop For Field Control in Superconducting Cavities (Musson)

020: Controlling Nonlinear Hardware in the FERMI @ Elettra LLRF System (Rohlev)

021: Lessons Learned from PEP-II LLRF and Longitudinal Feedback (Fox)

022: The LLRF System Design for the European XFEL (Jezynski)

023: LLRF Status and Commissioning Results for LHC (Baudrenghien)

024: Overview of LLRF Controls (with emphasis on beam dynamics and simulations) (Rivetta)

025: Survey of Receiver Hardware and Techniques (Ludwig)

026: Tektronix presentation (Broadwell)

027: Algorithm for Complete RF Vector Control in Efficient Fan-Out RF Power Distribution (Kang)

028: Enhancing Accelerator Reliability with LLRF Digital Technology (Lukovac)

029: LLRF Control Systems for J-PARC Synchrotrons (Tamura)

030: A Prototype RF Comb Filter Feedback for the Fermilab Main Injector (Berenc)

031: ESECON, 14-channel LLRF Controller (Cancelo)

032: Measurements of the 8-Channel Down-Converter Module for the New Muon Laboratory (Mavric)

033: Hunting for performance-limiting distortions in the LLRF feedback loops (Van Winkle)

034: Synchronism, Jitter and Communications in Accelerator Controls (Doolittle)

035: A Prototype RF Comb Filter Feedback for the Fermilab Main Injector (Berenc)

WG1: Working Group I:
Michizono, Champion (Linacs with focus on ILC and XFEL)

WG1-001: WG1 Linacs with focus on ILC and XFEL (Michizono, Champion)

WG1-002: Regulation Requirements for LLRF Control – Hoffmann

WG1-003: SIMCON and AMC Board – Jezynski

WG1-004: High Precision Receiver – Ludwig

WG1-005: Phase Reference System for the ILC – Lenkszus

WG1-006: ILC LLRF Hardware Baseline – Chase

WG1-007: Spartan LLRF for ILC – Doolittle

WG1-008: Multi-intermediate Frequency Mixture Technique – Matsumoto

WG1-009: Example of international collaboration - Cancelo

WG2: Working Group 2:
Simrock, Hovater (Commissioning, Operations, Automation, Testability)

WG2 Agenda

WG2-001: Automation Workshop – Simrock

WG2-002: An FSM-based Framdwork and Procedures for LLRF Automation – Brandt

WG2-003: A (Not) Complete (Whish-)List of Procedures for the LLRF FSM – Brandt

WG2-004: Exception Detection and Handling for Digital RF Control Systems – Simrock

WG2-005: LLRF Automation and Adaptive Feedforward – Brandt

WG2-006: Automation of large scale RF systems – Hoffmann

WG2-007: Finite State Machine for TTF RF System – Ayvazyan and Simrock

WG2-008: What needs to be automated – Simrock

WG2-009: LLRF Development at DESY - Simrock

WG3: Working Group 3:
Hofle, Teytelman (Rings with focus on LHC)

WG3 Agenda: Rings with focus on LHC – Hofle, Teytelman

WG3-001: Modern fast AD converters – Hofle

WG3-002: Running the PEP-II LLRF Hardware for the last Decade – Dusatko

WG3-003: RF Synchro – Baudrenghien

WG3-004: LHC Bunch Synchronous Digital Data Link – Molendijk

WG3-005: Postmortem systems – Van Winkle

WG3-006: Separating global and local station issues – Teytelman

WG3-007: RF configuration management - Teytelman

WG4: Working Group 4:
Chase, Doolittle (High reliability/availability considering hardware & software issues)

WG4 Agenda: High Availability, High Reliability – Chase, Doolittle

WG4-001: High availability issues and solutions at KEK – Michizono

WG4-002: LLRF Reliability/Availability LHC – Baudrenghien

WG4-003: Designing for Availability and Reliability – Chase

WG4-004: Paradigms for high-availability LLRF systems – Doolittle

WG4-005: RF Connectors – Crofford

WG4-006: Postmortem systems – Van Winkle
 

 
  Information Contact : Pamela Kite - kitepj@ornl.gov  

Oak Ridge National Laboratory

Office of Science